April 23, 2026

PNK Group Expands Its Presence in Pennsylvania with Land Acquisition in Reading, Berks County

PNK Group Expands Its Presence in Pennsylvania with Land Acquisition in Reading, Berks County

Reading, Pennsylvania – April 2026

Industrial developer PNK Group has acquired a 24-acre site in Reading, Berks County, Pennsylvania, opening a new submarket for the company and continuing its expansion across key logistics regions of the state. The site is planned for the development of PNK Reading at Route 222, a modern industrial facility totaling approximately 220,000 square feet. Construction is expected to begin in the second quarter of 2026.

The project is strategically located along Route 222 with direct access to Interstate 76 and Interstate 78, providing efficient transportation connectivity for regional and Northeast distribution operations.

Reading is the fourth-most populous city in Pennsylvania and offers a substantial and diversified labor pool, creating an attractive environment for companies seeking access to a qualified workforce.

Berks County has historically been one of Pennsylvania’s leading manufacturing hubs. Major corporate users already operating in the Reading area include Amazon, FedEx, Kimberly-Clark, East Penn Manufacturing, Ashley Furniture Industries, Alpek Polyester, S&S Activewear, and Sherwood Bedding, demonstrating sustained demand for industrial and manufacturing space in the region. An additional advantage of the project is its proximity to Norfolk Southern and CSX intermodal terminals, providing access to the region’s rail network. A FedEx logistics hub is located nearby, while a UPS facility is within approximately one hour of the site.

PNK Group delivers its projects using its proprietary Building Assembly Set (BAS) technology. The BAS method is based on the use of high-precision, large-format prefabricated components that enable accurate and efficient construction. All standardized structural elements are produced at PNK Group’s own factories in Georgia and Pennsylvania. Pre-assembled building components stored in inventory significantly accelerate on-site assembly and reduce overall project timelines.

PNK Group’s industrial buildings are versatile and highly adaptable, enabling seamless conversion between warehousing and manufacturing uses without significant reconstruction costs.

Learn more: PNK Reading at Route 222

Share this article:

Back to Top